According to initial plans of the town provided by the client and confirmed through verbal communication, the proposed structures are multistory buildings with and without basement(s).
PROGRAM OF WORK
One thousand and fifty boreholes down to a depth of 10.0m, with disturbed samples collected by means of single core barrel and standard penetration split barrel samplers.