DATE
January 2003
CLIENT
Campenon Bernard
LOCATION
The route extends from Ramsis Square to the Giza suburban station.
DESCRIPTION
The line links the northern part of Cairo (Shubra-El Kheima) to the city center before it crosses the Nile River to reach Giza.
PROGRAM OF WORK
PHASE 1A
13 boreholes with continuous sampling using Mazier and Vibro-percussion techniques with depths ranging from 30m to 52m
Installation of nine piezometers at depths ranging from 20m to 50m
Four flat dilatometer (DMT) tests at depths ranging from 13m to 29m
Four Electric Cone Penetration (ECPT) tests at depths ranging from 13m to 30m
PHASE 1B
15 boreholes with continuous sampling using Mazier and Vibro-percussion techniques with depths ranging from 30m to 50m
Three SPT boreholes with a depth of 35m
Installation of seven piezometers at depths ranging from 16m to 50m
Four flat dilatometer (DMT) tests at depths ranging from 13m to 19m
Four Electric Cone Penetration (ECPT) tests at depths ranging from 12m to 24m
PHASE 2
31 boreholes with continuous sampling using Mazier and Vibro-percussion techniques with depths ranging from 25m to 55m
18 SPT boreholes with depths ranging from 15m to 55m
Installation of 24 piezometers at depths ranging from 15m to 52m
Eight flat dilatometer (DMT) tests at depths ranging from 13m to 25m
12 Electric Cone Penetration (ECPT) tests with depths ranging from 15m to 32m
PHASE 2B
Three boreholes with continuous sampling using Mazier and Vibro-percussion techniques with depths ranging from 30m to 36m
20 SPT boreholes with depths ranging from 15m to 36m
Installation of six piezometers at depths ranging from 15m to 20m
Five Electric Cone Penetration (ECPT) tests at depths ranging from 17m to 23m
Soil Works, Material Testing, Surveying & Instrumentation