Eastern side of the Suez Canal on the Sinai Peninsula
ECT Company
Five boreholes down to 45m depth using triple core sampler (Mazier) with continuous coring; SPT test in the sand formation; and six UCPTs (Electric Cone Penetration Test) with pore water measurements down to 40m.
CLIENT
PROGRAM OF WORK
ELECTRIC TRANSFORMER STATION
Egyptian Electricity Authority
Two boreholes down to 50 m depths with continuous Coring using triple core sampler (Mazier); four UCPTs with pore water measurements down to 40 m.
CLIENT
PROGRAM OF WORK
DREDGING AREA
Ham Dredging
Three boreholes down to 50m depth and two boreholes down to 40m depth and 12 boreholes down to 30m and three boreholes down to 20m. Nine CPTUs down to 30m and three CPTUs down to 20m.
CLIENT
PROGRAM OF WORK
FENCE
Arab Contractors
Three boreholes 20m deep; three boreholes 10m deep.
CLIENT
PROGRAM OF WORK
ELECTRIC POWER STATION
Fugro – EDF
Twenty-six CPTUs down to 35m.
CLIENT
PROGRAM OF WORK
QUAY WALL
RODIO, CAMPENON BERNARD AND AIC
Three boreholes 100m deep and 11 boreholes 70m deep.
Five vibrating wire Piezometers, depth 20, 30, 40, 50 and 70m.
Two inclinometers 70m.
Twelve stand pipe Piezometers and six Piezometers 20m and 70m deep, respectively.
The samples were collected by continuous coring technique using Mazier, thin wall tube, piston sampler, and SPT.