BUILDINGS

Preparation of Quality Control/Quality Assurance Plans and Procedures and providing QC/QA engineers for supervising and monitoring these activities:

Earth Work

  • Excavation and support of excavations
  • Deep foundation treatment
  • Fill material: special measures and testing

Concrete Works

  • Selection and testing of materials for concrete (cement, aggregates, water and admixture for concrete), and reinforcement
  • Storing concrete materials
  • Design of concrete mixes and trial mixes of concrete
  • Cutting, bending, welding and fixing of reinforcement
  • Constructing joint and movement joint
  • Erection and removal of formwork
  • Concrete in large pours (mass concrete)
  • Hot weather concreting
  • Laboratory and field trial mixes

Brickwork and Block Work

  • Testing of bricks and blocks
  • Sample panels
  • Chemical resistant mortar
  • Ties for brickwork and block work
  • Bricks for sewer linings
  • Clay tiles for sewer linings
  • Plasticizer for cement mortar

Building Works

  • Damp proof membranes for roofs
  • Brickwork and block work
  • Brickwork reinforcement
  • Movement joint mastic and filler
  • Paints and protective coatings
  • Timber, carpentry and joinery, fixtures and fittings
  • Metal work, such as aluminum window frames, suspended ceilings, locker, sliding and folded steel doors, steel gates and railings
  • Gypsum plasters
  • Terrazzo tiles, glazed ceramic wall tiles and fittings, cement tiles for roof
  • Preparation and painting schedule for architectural and building work
  • Preparation and painting schedule for metal surfaces
  • Galvanizing
  • Epoxy coating work
  • Internal and external colors schedule

Soil Works, Material Testing, Surveying & Instrumentation

Geotechnical Egypt Company