NUCLEAR REACTOR (MULTI-PURPOSE)

Preparation of Quality Control/Quality Assurance Plan and Procedures and providing QC/QA engineers for supervising and monitoring the following activities:

Earth Work

  • Geotechnical information
  • Excavation and support of excavations
  • Deep foundation treatment
  • Fill material: special measures and testing

 

Normal Concrete

  • Selection and testing of materials for concrete (cement, aggregates, water and admixture for concrete), and reinforcement
  • Storing concrete materials
  • Design of concrete mixes and trial mixes of concrete
  • Cutting, bending, welding and fixing of reinforcements
  • Constructing joint and movement joint
  • Erection and removal of formwork
  • Concrete in large pours (mass concrete)
  • Hot weather concreting

 

Heavyweight and Radiation Shielding Concrete

  • Selection and testing of heavyweight aggregates
  • Storing concrete materials
  • Design of heavyweight concrete mixes
  • Laboratory and field trial mixes
  • Mixing and placing of heavyweight concrete
  • Testing of fresh and hardened heavyweight concrete
  • Hot weather concreting

 

Brickwork and Block Work

  • Testing of bricks and blocks
  • Sample panels
  • Chemical resistant mortar
  • Ties for brickwork and block work
  • Bricks for sewer linings
  • Clay tiles for sewer linings
  • Plasticizer for cement mortar

 

Road Work

  • Earth works
  • Formation of sub-grade
  • Testing and storing materials for sub-base and road base
  • Sealing surfaces
  • Testing of temporary and final reinstatement
  • Testing of concrete pavement
  • Surface levels: tolerances
  • Concrete bollards

 

Building Works

  • Damp proof membranes for roofs
  • Brickwork and block work
  • Brickwork reinforcement
  • Movement joint mastic and filler
  • Paints and protective coatings
  • Timber, carpentry and joinery, fixtures and fittings
  • Metal work, such as aluminum window frames, suspended ceilings, locker, sliding and folded steel doors, steel gates and railings
  • Gypsum plasters
  • Terrazzo tiles, glazed ceramic wall tiles and tile fittings, cement tiles for roof
  • Preparation and painting schedule for architectural and building work
  • Preparation and painting schedule for metal surfaces
  • Galvanizing
  • Epoxy coating work
  • Internal and external colors schedule

 

Steel Work, Metal Work & Miscellaneous Items

  • Structural steel work
  • Fabrication and testing
  • Bolting metal work to concrete
  • Venture flume installation

 

Fences

  • Erection of fences and gates

 

Soil Works, Material Testing, Surveying & Instrumentation