WASTEWATER TREATMENT PLANTS

Preparation of Quality Control Plan and Procedures, and providing quality control engineers for monitoring these activities:

Earth Work

  • Geotechnical information and dewatering
  • Trial holes
  • Excavation and support of excavations
  • Trench excavation for pipelines
  • Deep foundation treatment
  • Fill material: special measures and testing
  • Steel sheet piling
  • Embankments and site grading

 

Concrete

  • Selection and testing of materials for concrete (cement, aggregates, water and admixture), reinforcement, water stops, joint sealer, and joint filter
  • Storing concrete materials
  • Design of concrete mixes and trial mixes of concrete
  • Cutting, bending, welding and fixing of reinforcements
  • Constructing joint and movement joint
  • Erection and removal of formwork
  • Concrete in large pours (mass concrete)
  • Hot weather concreting
  • Slip forms for tanks
  • Structural pre-cast concrete (strength, dimensional tolerances)
  • Installation of pre-cast concrete structural members
  • Cutting and testing of core samples

 

Piles

  • Cast in-situ piles
  • Concrete test cylinder for piles
  • Pile testing, procedures and recorded data
  • Pre-cast piles (formwork, concreting), curing handling and storage of piles
  • Sequence for construction
  • Length and tolerances of piles

 

Brickwork and Block Work

  • Testing of bricks and blocks
  • Sample panels
  • Chemical resistant mortar
  • Ties for brickwork and block work
  • Bricks for sewer linings
  • Clay tiles for sewer linings
  • Plasticizer for cement mortar

 

Road Work

  • Earth works and drainage
  • Formation of sub-grade
  • Testing and storing materials for sub-base and road base
  • Sealing surfaces
  • Testing of temporary and final reinstatement
  • Testing of concrete pavement
  • Surface levels: tolerances
  • Kerb laying
  • Footpaths
  • Road markings
  • Concrete Bollards

Building Works

  • Building paper
  • Damp proof membranes for roofs
  • Brickwork and block work
  • Brickwork reinforcement
  • Movement joint mastic and filler
  • Paints and protective coatings
  • Timber, carpentry and joinery, fixtures and fittings
  • Metal work, such as aluminum window frames, suspended ceilings, locker, sliding and folded steel doors, steel gates and railings
  • Gypsum plasters
  • Terrazzo tiles, glazed ceramic wall tiles and fittings, and cement tiles for roof
  • Preparation and painting schedule for architectural and building work
  • Preparation and painting schedule for metal surfaces
  • Galvanizing
  • Epoxy coating work
  • Internal and external colors schedule

 

Pipelines

  • Pipelines materials
  • Concrete pipes
  • Iron pipes and fittings
  • Vitrified clay pipes and fittings
  • Polyethylene pipes
  • Granular material for bedding to pipelines
  • Joint rings and lubricants
  • Gaskets for flanged joint
  • Flexible couplings and flange adapters
  • Valves
  • Building pipes through structures
  • Concrete and surround
  • Protection of bolted couplings and adaptors
  • Testing of pipelines (air test and water test)
  • Testing of pressure pipelines or force mains
  • Television inspection of non-pressure pipelines

 

Steel Work, Metal Work & Miscellaneous Items

  • Structural steel work
  • Fabrication and testing
  • Bolting metal work to concrete
  • Fixing manhole cover frames
  • Venture flume installation
  • Erecting flame poles

Soil Works, Material Testing, Surveying & Instrumentation

Geotechnical Egypt Company