Client

Conselho Municipal de Maputo

Date

2011 - 2015

Area

13 Km (approx.)

The main objective of the project is to limit the continuous erosion of the city shoreline and to establish an integrated plan to protect public and private properties and reduce the deterioration of the environment.  The scope included review of initial topographic and bathymetric survey, as well as surveys during construction submitted by the contractor.

Soil Works, Material Testing, Surveying & Instrumentation

Geotechnical Egypt Company