Client

El-Nasr Mining Company

Date

2014 - ongoing

Area

100,000 sq.m

The scope includes topographic survey of site and the review of the bathymetric survey which was submitted by contractor.

The works include supply transfer of floating mooring facilities, construction of telescopic ship loader, construction of conveyor belt system, construction of storage and administration buildings.

Soil Works, Material Testing, Surveying & Instrumentation

Geotechnical Egypt Company