Client

Iberdola Engineering & Consultancy - S.A.U. Spain

Date

2008

Area

381,000m2

A topographic survey for the intake and discharge lines, as well as the approach to the plant was conducted. The boundaries were also verified and reported. The scope included the survey of existing utilities around the site above and underground.

Soil Works, Material Testing, Surveying & Instrumentation

Geotechnical Egypt Company