Client

Sukhna Refinery & Petrochemicals Co.

Date

2008

Area

1,000,000 m2

A comprehensive topographic survey was conducted including the construction of 6 control stations. The scope also included the setting out of 30 boreholes and determining their as-built locations after drilling.

Soil Works, Material Testing, Surveying & Instrumentation

Geotechnical Egypt Company